Review the requirements that matter
Heat treatment must be selected for the specified alloy and component requirements. Agree the processing sequence and acceptance criteria during quotation, including the relationship between treatment, machining and final inspection.
Requirements
State the applicable material specification and required final properties or condition.
Processing responsibility
Identify which organization performs the treatment and how the records relate to the casting batch.
Verification
Agree which tests, certificates or inspection records are included in the order.
From quotation to repeat orders
- Define the enquiry. Provide the current drawing revision, specified material, quantities and target delivery. Highlight features that determine assembly fit or function.
- Agree the manufacturing route. Review tooling, casting, machining and any treatment or finishing together. Confirm which requirements are included in the quotation.
- Agree acceptance before production. Define the sample approval, inspection records and documentation required for the particular order.
- Control repeat production. Keep drawing revisions, material requirements and agreed changes traceable between orders.
Available grades, dimensional limits, tolerances, testing and delivery dates are confirmed for the specific component. Sector experience does not replace project-specific qualification or approval.
