CASTING & PRECISION MACHINING
Company / toway cast

Quality & Inspection Planning

Plan casting inspection, material identification and sample acceptance around the drawing. Confirm required records and project-specific qualification with toway cast.

Request A Quote ↗
Drawing-led manufacturing

Define the requirement.
Then review the route.

  • Material, geometry and critical features
  • Machining and final surface condition
  • Inspection, documentation and quantities
Capabilities are confirmed per component. Proposed topics are not verified service claims.

Define evidence before approving production

Quality planning starts with the actual component and its acceptance requirements. A general quality statement does not replace the specified alloy, drawing revision, inspection scope or required customer approval.

An enquiry-to-acceptance checklist

Review areaWhat to define in the enquiry
Material identificationSpecified cast grade, condition and required material records.
Dimensional inspectionCritical features, datum references and agreed measurement basis.
Surface acceptanceFunctional finish requirements and approved appearance sample where relevant.
Testing scopeAny required test method, acceptance criterion and responsible party.
Sample approvalDrawing revision, sample report and acceptance decision.
Change controlApproval process for drawing, material or manufacturing changes.

Qualifications must match the application

Aerospace, medical, rail and defense projects can have additional customer requirements. Confirm the relevant qualification scope before awarding work. Request current documentation and confirm its scope and validity for your project.

Prepare an inspection discussion

Start with drawing-defined tolerance requirements and include the required records when requesting a quote.

From a drawing to a manufacturing plan

Bring the requirements.
Let’s review the route.

Specify your material, quantities and critical features so casting, machining and secondary processing can be reviewed together.

  • Current drawing revision
  • Alloy, quantities & final condition
  • Inspection & delivery requirements
Prepare a casting enquiry