Define evidence before approving production
Quality planning starts with the actual component and its acceptance requirements. A general quality statement does not replace the specified alloy, drawing revision, inspection scope or required customer approval.
An enquiry-to-acceptance checklist
| Review area | What to define in the enquiry |
|---|---|
| Material identification | Specified cast grade, condition and required material records. |
| Dimensional inspection | Critical features, datum references and agreed measurement basis. |
| Surface acceptance | Functional finish requirements and approved appearance sample where relevant. |
| Testing scope | Any required test method, acceptance criterion and responsible party. |
| Sample approval | Drawing revision, sample report and acceptance decision. |
| Change control | Approval process for drawing, material or manufacturing changes. |
Qualifications must match the application
Aerospace, medical, rail and defense projects can have additional customer requirements. Confirm the relevant qualification scope before awarding work. Request current documentation and confirm its scope and validity for your project.
Prepare an inspection discussion
Start with drawing-defined tolerance requirements and include the required records when requesting a quote.
